Water-cooled Welding Device
Water-cooled Argon Arc Welding
cooling circulating water tank
 single phase
0.35 MPA/50 Hz
inlet connector
 manual (English language)

Water-cooled Welding Device - Water-cooled Argon Arc Welding WRC-300A

$272.99
  • Availability:
    In Stock
  • SKU:
    OT-TWYJ-2297
  • Estimated Delivery:Mar 31 - Apr 04

  • Free Fast Shipping: On all orders

 Water-cooled Welding Device

Water-cooled Welding Device - Water-cooled Argon Arc Welding WRC-300A

$272.99
Product description
  • The core of this product is fully formed and made by itself. The pressure of the pump is 3 kg. The flow rate is more than 20 / min. The swivel pump has its own cooling function.
  • Economical and practical water tank, light weight, small volume, easy to move; the water tank is made of high temperature resistant material to prevent water leakage.
  • Use a vertebral pump with copper pump to avoid deposits caused by long-term use. The pressure is 3 kg.
  • The transparent water level test window can detect the water level in time, the positive water injection inlet is more convenient for water injection.
  • Unique design of heat dissipation in the wind tunnel, 30% higher cooling performance than similar products.
Description:
The design of the cooling circulating water tank structure is reasonable and convenient to use. The box has a vortex self-heating pump, a water circulation heat sink, a water circulation system, and a high temperature plastic water storage tank. The working principle is: the water in the water storage tank is introduced by the vortex pump, and after being pressurized, the water circulation system passes through the equipment to be cooled, and the water with higher temperature is discharged, and the radiator is cooled by the internal radiator of the machine. Heat the water to lower the water temperature, then return to the water tank and re-enter the circulation system to achieve the purpose of cooling the equipment.

Scope of application:
This cooling tank is designed for use with TIG welders to provide powerful cooling. At the same time, it can also be used with other brands of welders, just remove or replace the plug.
(AC/DC argon arc welding equipment, DC argon arc welding equipment, CO2 welding equipment, resistance welding equipment and other plasma equipment.)

Function parameters:
Power supply voltage: 220 V/50 Hz.
Phase number: single phase.
Heat dissipation: 1.5 kW (1 L/min).
Pump power: 370 W.
Maximum pressure / lift: 0.35 MPA/50 Hz.
Water capacity: about 10 L.
Operating temperature: -20 °C ~ 60 °C.
Weight: 17 kg.
Dimensions (mm): 456 × 253 × 328.

Package includes:
1 x welder water cooler.
1 x water pipe.
1 x inlet connector.
1 x socket connector.
1 x manual (English language

We ship from the local warehouse, DHL/UPS and other logistics transport.
Shipping & Return
Shipping Policy

We offer free shipping on all orders with UPS Ground in the US mainland. Transit time with UPS ground shipping is anywhere from 3-4 business days depending on your location. If you have any questions, feel free to contact via email support@cncest.com or Tel: +86-18981865415.

Note: We are unable to ship to Alaska, Hawaii, Puerto Rico, APO/FPO, or U.S. territory.

We use the highest quality and fastest logistics companies such as UPS Logistics, USPS, and FedEx Logistics to assist transportation.

Note: We don't use the post office box.

Shipping Times

Most products ship within 3 business days from the date of your order (unless indicated on the product page). We will send you tracking information as soon as it is available. If you do not receive tracking info within 5 business days of your order, feel free to follow up with us via email.

DELIVERY DAYS: 3-4 Business DAYS
Processing Time: 3 Business days
Our advantages: We have three local warehouses located in NJ, CA & GA. The goods will ship to you from the closest warehouse.

 

International Purchase
Import duties, taxes, and charges are not included in the item price or shipping charges. The buyer should be responsible for these charges.


For more details, please check our Shipping Policy page.


Return Policy

All our products could return for free within 60 days for some reason! Please check our Return Policy page for more details.


Refund Policy

Every product is backed by a 12-months warranty and a 60-day return policy from the date of purchase. Exceptional circumstances will be listed clearly in the listing. If you need to return a product and get a refund, please contact us for a free shipping label and ship it back.


The refund would be processed after the item is received by our warehouse staff, which is confirmed to be unopened and in good condition. You may learn more details on our Refund Policy page.

 

Contact Us:

Address:

NO 3 TAI YAU STREET
San Po Kong, Kowloon, HK

Tel: +86-18981865415
Our telephone working hours: Monday to Friday, 8:00-17:00 (GMT- 08:00)

Email: support@cncest.com (Emails will be answered within 24 hours.
(Except weekends and public holidays)

Wholesale Inquiry

Reviews

Customer Reviews

Based on 3 reviews Write a review